STED COUNCIL CERTIFICATE IN QUANTITY SURVEYING & COST ESTIMATION 2025 SCHEME 0% QS/QP Exam Online Exam Your NameEmail-idPhone Number 1 / 30 1) The Damp Proof Course (D.P.C) is measured in None of the above m m³ m² 2 / 30 2) The unit of measurement of Plastering is in m² m³ None of the above m 3 / 30 3) The order of booking dimensions are Length, Breadth, Height Breadth, Height, Length Height, Length, Breadth Length, Height, Breadth 4 / 30 4) The most reliable estimate is Preliminary Estimate Detailed Estimate Plinth Area Estimate Cube rate Estimate 5 / 30 5) 1 Cent equals 40.47 m² 4047 m² 10000 m² 100 m² 6 / 30 6) The Volume of 1 bag of cement 22.5L 30L 35L 50L 7 / 30 7) The centre line length of a hall of size 6x4 m with wall thickness 30 cm is Centre line Length = 2(6.3+4.3) = 21.2 m 20.6 21.2m 20m 20.8 8 / 30 8) Water required for 1 bag of cement is 30 Liters, the water-cement ratio is: 0.60 0.50 0.70 0.80 9 / 30 9) One Newton is equal to 105 dynes 106 dynes 10² dynes 10³ dynes 10 / 30 10) The number of standard bricks required for 1 m³ work is 550 460 650 500 11 / 30 11) As per National Building Code (NBC) Life period of a building should be at least 50 years 100 years 75 years 60 years 12 / 30 12) The unit of measurement of partition wall is m² Numbers m a. m³ 13 / 30 13) In the detailed estimate the volumes are worked out to the nearest a. 0.001 m³ 0.1 m³ b. 0.01 m³ 0.0001 m³ 14 / 30 14) For calculating quantity of steel, density of steel may be taken as 78.5 Kg/m³ 785 Kg/m³ 7850 Kg/m³ 7.8 Kg/m³ 15 / 30 15) The initial lead for earth work is 1.5 m 15 m 10 m 50 m 16 / 30 16) M20 Mix 1: 2: 4 1: 1.5: 3 1: 3: 6 1: 1: 2 17 / 30 17) In calculating the quantity of brick work no deduction shall be for the opening up to 1 m² 10 m² 0.5 m² 0.1 m² 18 / 30 18) Density of cement 1320kg/m³ 1440kg/m³ 1200kg/m³ 1100kg/m³ 19 / 30 19) For 45° bent up bar, the additional length of one bent up is 0.42d 0.45d 0.9d d 20 / 30 20) Which one of the following data is necessary for making an estimate Specification Plan All the above Section 21 / 30 21) Unit of Surface Tension N/m² Nm N N/m 22 / 30 22) 2 denotes what in 1:2:4 mix Cement Water Sand Coarse Aggregate 23 / 30 23) The Scale of Building Plan as per KMBR is 1:100 . 1:1 1:400 1:200 24 / 30 24) The ratio of total built-up area of a building to the total area of the plot is called Floor Space Index (FSI) also known as Floor Area Ratio (FAR) Plinth area Built up area Carpet area Floor Space Index (FSI) 25 / 30 25) The centre line method is specially adopted for estimating Rectangular Buildings Circular Buildings Hexagonal Buildings All the above 26 / 30 26) The weight of an item is measured correct to nearest 1 Kg 0.25 Kg 0.1 Kg 0.50 Kg 27 / 30 27) d²/162 2 Kg 2.98 Kg 2.47 Kg 1.58 Kg 28 / 30 28) Unit of measurement of R.C.C work m³ m² Kg m 29 / 30 29) Set back distance required at rear of a building is 1.25 m 1.50 m 1.75 m 2.00 m 30 / 30 30) A slab which is supported on all its four edges and the ratio of its long span to short span is not more than 2 is called a: One Way Slab Four Way Slab Two Way Slab None of the Above Your score is 0%