STED COUNCIL CERTIFICATE IN QUANTITY SURVEYING & COST ESTIMATION 2025 SCHEME 0% QS/QP Exam Online Exam Your NameEmail-idPhone Number 1 / 30 1) Density of cement 1440kg/m³ 1200kg/m³ 1320kg/m³ 1100kg/m³ 2 / 30 2) The ratio of total built-up area of a building to the total area of the plot is called Floor Space Index (FSI) also known as Floor Area Ratio (FAR) Floor Space Index (FSI) Carpet area Plinth area Built up area 3 / 30 3) 1 Cent equals 100 m² 40.47 m² 10000 m² 4047 m² 4 / 30 4) Set back distance required at rear of a building is 2.00 m 1.75 m 1.25 m 1.50 m 5 / 30 5) The centre line method is specially adopted for estimating Circular Buildings All the above Hexagonal Buildings Rectangular Buildings 6 / 30 6) M20 Mix 1: 3: 6 1: 1: 2 1: 2: 4 1: 1.5: 3 7 / 30 7) In the detailed estimate the volumes are worked out to the nearest b. 0.01 m³ 0.0001 m³ a. 0.001 m³ 0.1 m³ 8 / 30 8) The number of standard bricks required for 1 m³ work is 460 550 650 500 9 / 30 9) The weight of an item is measured correct to nearest 0.1 Kg 0.25 Kg 0.50 Kg 1 Kg 10 / 30 10) One Newton is equal to 106 dynes 105 dynes 10³ dynes 10² dynes 11 / 30 11) Unit of Surface Tension Nm N N/m N/m² 12 / 30 12) For calculating quantity of steel, density of steel may be taken as 785 Kg/m³ 7.8 Kg/m³ 7850 Kg/m³ 78.5 Kg/m³ 13 / 30 13) Which one of the following data is necessary for making an estimate Section Specification All the above Plan 14 / 30 14) As per National Building Code (NBC) Life period of a building should be at least 50 years 60 years 100 years 75 years 15 / 30 15) Unit of measurement of R.C.C work m m³ Kg m² 16 / 30 16) d²/162 2.47 Kg 2 Kg 1.58 Kg 2.98 Kg 17 / 30 17) Water required for 1 bag of cement is 30 Liters, the water-cement ratio is: 0.50 0.80 0.60 0.70 18 / 30 18) The unit of measurement of partition wall is Numbers m² a. m³ m 19 / 30 19) The centre line length of a hall of size 6x4 m with wall thickness 30 cm is Centre line Length = 2(6.3+4.3) = 21.2 m 21.2m 20.8 20.6 20m 20 / 30 20) For 45° bent up bar, the additional length of one bent up is 0.42d 0.9d d 0.45d 21 / 30 21) 2 denotes what in 1:2:4 mix Coarse Aggregate Cement Sand Water 22 / 30 22) The Volume of 1 bag of cement 50L 30L 35L 22.5L 23 / 30 23) The order of booking dimensions are Length, Height, Breadth Breadth, Height, Length Length, Breadth, Height Height, Length, Breadth 24 / 30 24) The most reliable estimate is Plinth Area Estimate Preliminary Estimate Detailed Estimate Cube rate Estimate 25 / 30 25) The initial lead for earth work is 10 m 1.5 m 15 m 50 m 26 / 30 26) A slab which is supported on all its four edges and the ratio of its long span to short span is not more than 2 is called a: Four Way Slab One Way Slab Two Way Slab None of the Above 27 / 30 27) The unit of measurement of Plastering is in None of the above m² m³ m 28 / 30 28) The Damp Proof Course (D.P.C) is measured in None of the above m² m m³ 29 / 30 29) The Scale of Building Plan as per KMBR is . 1:1 1:200 1:400 1:100 30 / 30 30) In calculating the quantity of brick work no deduction shall be for the opening up to 0.5 m² 1 m² 10 m² 0.1 m² Your score is 0%